Lithium Extraction Project with Output of 50,000t/a (LCE) Lithium Chloride from Salt Lake in Argentina
Page view:
1970-01-01 08:00
The project is located in Salta Province, Argentine, the "lithium triangle" of South America. The mining depth of the aquifer in the brine extraction area reaches 300m. 72 brine extraction wells are used, and the annual brine extraction and transportation capacity reaches 23,000,000m3. The project was completed and put into operation in 2023.
next page
International