Boffa Bauxite Project
Release time:
2024-07-10
It is the "No.1 Project" to build an overseas bauxite base for CHINALCO's strategy. The efficient green mining technology for low-latitude eluvial bauxite has been developed for the first time. The design capacity is 35000kt/a, including 15000kt/a for Phase I and 20000kt/a for Phase II. The design adopts the environmental-friendly on-blasting continuous mining process integrating mining, crushing and loading, 24km high-speed cross-country belt conveying technology with large transportation capacity, 700,000~2,000,000 tons terminal yard and stacker-reclaimer system, and heavy oil power station, power transformation and distribution system, and transmission system achieving isolated grid power self-sufficiency. The project won the first batch of National Quality Engineering Awards (overseas project).
Performance