The detailed survey on geotechnical engineering of Lutong ore-washing area
Release time:
2015-08-07
The project is located in Lutong, Jingxi town and belongs to Guangxi Xinfa aluminum electricity Co.,Ltd. In 2010, CINF did the detailed design of the borehole arrangement, depth, insitu test number and sampling number, based on the existing specifications and regulations. The results are as foloows: total drilling depth 5,921.79m with 338 bore holes; 78 standard penetration tests; 760m heavy dynamic sounding test on 17 holes; 56 soil samples; 6 water samples; 50 sets of rock samples. The survey results showed that the field is stable, the results can meet requirement of the engineering design and construction.

Working site

Borehole cores
next page
next page
Performance