Search

File Download Center

Tel: 0086 731 84397078
Email:
intl@cinf.chalieco.com.

cnhncinf@163.com

Add: No.299 East Mulian Rd., Changsha,
Hunan province, China
Postcode: 410001

Online message

CONTACT US

CINF Engineering Corporation Limited   湘ICP备18015267号-2   Powered by www.300.cn  Changsha  Manager

>
>
>
The technical consultation service for detailed survey of hydrogeology, geotechnics and environmental geology in the Wandongshan section in Beiya Fe-Au Mine

Performance

The technical consultation service for detailed survey of hydrogeology, geotechnics and environmental geology in the Wandongshan section in Beiya Fe-Au Mine

Page view

The project is located in Heqing, Yunnan Province. The hydrogeological conditions are complex. In 2010, CINF undertook the technical consultation on the detailed survey of hydrogeology, geotechnics and environmental geology. Through the hydrogeological drilling, geophysical prospecting, detailed survey of hydrogeology, geotechnics and environmental geology, pumping test, CINF developed the hydrogeological conceptual model, and presented the proposals for the prevention against the mine surface water and underground water to solve the potential problems in future mining.

CINF Engineering Corporation Limited          CINF Engineering Corporation Limited
Mining collapse                                                    W123 spring outlet