The project was built to produce 5,000t APT (in later period it was planned to produce 10kt/a). The design was completed in 2004 and the project was put into production in 2005.
The W smelter
Tel: 0086 731 84397078
Email: intl@cinf.chalieco.com.
CINF Engineering Corporation Limited 湘ICP备18015267号-2 Powered by www.300.cn Changsha Manager
The project was built to produce 5,000t APT (in later period it was planned to produce 10kt/a). The design was completed in 2004 and the project was put into production in 2005.
The W smelter