Zhejiang Weiming Shengoing 50,000 TPA of High Purity Electrodeposited Nickel and 200,000 TPA and Positive Electrode Materials Project
The project is located in Wenzhou City, Zhejiang Province. It aims to construct a crude nickel hydroxide cobalt refining unit and a high-purity nickel electrolytic deposition unit with an 50,000 TPA of high-purity nickel, 200,000 tons of precursor and positive electrode material by-products as sponge copper, and intermediate products as battery grade nickel sulfate, cobalt sulfate, manganese sulfate, etc.
Guangxi Huayou New Materials Co.. Ltd, Annual Production of 50,000 Tons of High Purity Nickel Products Project
The project uses high nickel MATTLE and nickel intermediate products as raw materials, and adopts the process of atmospheric pressure leaching, high-pressure oxygen leaching, extraction, electro deposition, and anodic liquid nickel acid dissolution. The annual production of high-purity electro deposited nickel is 50000 tons. The proiect operate in May 2023.
Nanfang Group 300,000 tpa Zinc Oxygen Pressure Leaching Green Manufacturing Project
The world's largest single series oxygen pressure leaching zinc smelting production line, with a construction scale of 300kt/a single series electric zinc, adopts ,The various technical and economic indicators are at the international leading level. Successfully put into production in November 2023.
The Southwest Copper Industry of China Copper Relocation Project
Located in Anning County, Yunnan Province, the project adopts the oxygen enriched side and top blowing smelting process, with an anode copper production capacity of 350000 tons and cathode copper production capacity of 550000 tons.collocating 1,200,000 tons of sulfuric acid, in which the patented partial pre-conversion technology and low-temp. heat recovery technology was adopted.,CINF is responsible for the engineering design of the project and Partial project EPC.
Guangxinanguo Copper Industry 400.000tpa Side and Top Blowing Continuous Smelting Project
The world's largest oxygen enriched side and top blowing furnace continuous copper refining project, with a single line copper production capacity of 400000 tons, a designed oxygen enriched side blowing furnace bed area of 70 square meters, and a multi gun top blowing furnace area of 120 square meters. Its various technical indicators are world leading.
European Manganese Electrolytic Manganese Metal Project
Project construction location: European Manganese Industry, Hvaletice Town, Pardubice Oblast, Czech Republic; Construction scale: annual output of 47,500 tons of high-purity selenium-free electrolytic manganese metal; Project features: The manganese content of raw materials is only 7.08%, and the soluble manganese rate is low. Process flow: The classic process flow of pulping, leaching and iron removal, purification, electrolysis, washing, drying, product stripping and packaging is adopted.
Jiaman New Energy Co., Ltd. High Matte Nickel Project
The Jiaman project is located in Maluku Province, Indonesia. The construction scale is to produce 40,000 tons of high nickel matte per year. It uses oxygen-enriched side-blowing smelting to process laterite nickel ore, and produces low nickel matte through reduction and sulfidation. Low nickel matte is treated by multi-gun top blowing furnace, and high nickel matte products containing 70% nickel are produced. This project is the world's first multi-gun top-blowing furnace to blow low nickel matte into high nickel matte, and will be put into production in April 2025.
Overall Development Planning Study and Design for TFM Copper-Cobalt Mine in the Democratic Republic of the Congo
The TFM copper-cobalt mine is located in Fungurume Town, Kolwezi City, Lualaba Province, DRC. The mine is in production with copper output of 450,000t/a and cobalt output of 38,000t/a. It is currently one of the top 10 copper mines in the world and the second largest cobalt mine in the world. In view of the resource advantages of CMOC Group Limited's TFM copper-cobalt mine in the DRC, CINF is currently conducting the overall development planning study and design for the mine, optimizing the existing open-pit mining, processing and metallurgical system, adding underground mining and supporting processing and metallurgical facilities. Within 3 to 5 years after the implementation of the planning project, the TFM copper-cobalt mine can achieve the target of cathode copper output of 650,000 to 800,000 tons/year, achieve a total industrial output value of over 10 billion US dollars/year, and create more than 3,000 related jobs. The economic and social benefits are significant.
Geological Exploration
Mining and Mineral Processing
Metallurgy
New Energy and New Materials
EPC
Equipment Manufacture
Architecture
Energy and Power
Supervision
Tailings Storage Facility
Water Supply and Drainage
Supervision Works