Chinese
Home
About us
News
Sectors
Performance
Technologies
International
Contact us
The geological reconnaissance on Taiping sedimentary bauxite mine in Pingguo, Guangxi province
The project is located in Pingguo, Guangxi Province. It belongs to the Guangxi Branch of Chinalco. In 2007, CINF began to undertake the reconnaissance on the 20km2 sedimentary bauxite mine of Taiping
The detailed survey on geotechnical engineering of Lutong ore-washing area
The project is located in Lutong, Jingxi town and belongs to Guangxi Xinfa aluminum electricity Co.,Ltd. In 2010, CINF did the detailed design of the borehole arrangement, depth, in-situ test number a
Fluorite comprehensive recovery from the flotation tailings in Shizhuyuan complex mine
The project is located in Chenzhou, Hunan Province. The capacity is 4kt/d and it is the largest fluorite associated deposit. In view of the low grade of the fluorite and large amount of tailings,
The mining project of Hunan Qilijing mirabilite mine
The project is located in Hengyang, Hunan Province, owned by Hunan Xinli Chemical Industry Co., Ltd. The production capacity of the mine is 3,000kt/a mirabilite.
The mining and processing project of Hunan Shizhuyuan W-Mo complex mine
The project is located in Chenzhou, Hunan Province. The design capacity is 2kt/d and it was put into production in 2006. The mine contains various valuable metal elements and is thus called “a museum
The mining, processing upgrading and expansion project of gold-copper mine of Hubei Sanxin Co.
The project is located in Daye, Hubei province, owned by Hubei Sanxin Gold-copper Co., Ltd. The production capacity is 3,000t/d. It’s a large copper-gold complex mine with deep-shaft.
The mining and processing project of Henan Nannihu molybdenum mine
The project is located in Luchuan, Henan province, owned by Luanchuan Longyu Molybdenum Industry Co.. The production capacity is 30,000t/d. The open pit is developed with several accesses to reduce th
The mining and processing project of Tibet Jiama Cu complex mine
The project is located in Tibet Autonomous Region. The capacity of PhaseⅠis 6kt/d and Phase Ⅱ is 40kt/d. The highest elevation of the mine is 5,500m and the concentrator is constructed in the 4,600m e
Geological Exploration
Mining and Mineral Processing
Metallurgy
New Energy and New Materials
EPC
Equipment Manufacture
Architecture
Energy and Power
Supervision
Tailings Storage Facility
Water Supply and Drainage
Supervision Works