Coal, electricity and aluminum integration project of Wachangping bauxite mine for State Power Investment Corporation Limited, Zunyi, Guizhou.
The project is the first metal mine to adopt the longwall comprehensive mechanized mining technology. It has formed a production capacity of 3,000 t/d bauxite by “one shaft,one face and one set” of integrated mining equipment. It successfully solved problems and technological difficulties of roof corrosion development, water filling, safety, high-efficiency and low dilution loss of unstable and gentle-inclined thin-medium thick difficult-mining orebody, which adds a new mining technique for metal mining.
Laohudong Phosphate Mine Project of Weng 'an County Tianyi Mining Co., Ltd.
The designed mining and beneficiation capacity is 5,000kt/a. It is the single largest underground phosphate mine in China's chemical industry. New technologies of skip-shaft and auxiliary shaft development and transportation, upward horizontal slicing and filling mining method and upward drift filling mining method, self-gelling hemihydrate phosphogypsum plus tailings paste filling method and so on, are firstly adopted in the chemical mine to realize large-scale safe and efficient mining, which provides a new idea for phosphate mining.
Boffa Bauxite Project
The production capacity of the first phase is 12 million t/a. It is the “No. 1 Project” of Chinalco's “Two-sea Strategy” to build a bauxite overseas base and the first time to develop the high-efficient and green mining technology of low-latitude leaching residual bauxite. The design adopts the world advanced green and environmentally friendly open-pit mining technology that integrates mining, crushing and loading, the 24km large-scale, long-distance and high-speed cross-country belt conveying technology and the super-large advanced equipment. The project started in Oct., 2018, was put into production in Apr., 2020 and reached ramp-up and the standard in Jun., 2020.
Resources integration and development project of Jiaojia gold mineralization belt of Shandong Gold Group Co., Ltd.
The designed capacity of mining and beneficiation is 6,600kt/a. It is the largest underground mining project of gold industry in China, and also one of the key projects of Shandong Gold Group Co., Ltd. to build a world class gold production base. The project always implements the design concept of building a world-class demonstration mine, green ecological mine and intelligent mine, with the goal of building a world-class leader of "intelligent mine" and "ecological mining".
Fluorite comprehensive recovery from the flotation tailings in Shizhuyuan complex mine
The project is located in Chenzhou, Hunan Province. The capacity is 4kt/d and it is the largest fluorite associated deposit. In view of the low grade of the fluorite and large amount of tailings,
The mining project of Hunan Qilijing mirabilite mine
The project is located in Hengyang, Hunan Province, owned by Hunan Xinli Chemical Industry Co., Ltd. The production capacity of the mine is 3,000kt/a mirabilite.
The mining and processing project of Hunan Shizhuyuan W-Mo complex mine
The project is located in Chenzhou, Hunan Province. The design capacity is 2kt/d and it was put into production in 2006. The mine contains various valuable metal elements and is thus called “a museum
The mining, processing upgrading and expansion project of gold-copper mine of Hubei Sanxin Co.
The project is located in Daye, Hubei province, owned by Hubei Sanxin Gold-copper Co., Ltd. The production capacity is 3,000t/d. It’s a large copper-gold complex mine with deep-shaft.
Geological Exploration
Mining and Mineral Processing
Metallurgy
New Energy and New Materials
EPC
Equipment Manufacture
Architecture
Energy and Power
Supervision
Tailings Storage Facility
Water Supply and Drainage
Supervision Works