Chinese
Home
About us
News
Sectors
Performance
Technologies
International
Contact us
The Kivcet lead direct smelting project of Zhuzhou Smelting Group (Pb concentrate blended with Zn leaching residue as raw materials)
The project is located in Zhuzhou, Hunan Province with capacity up to 100kt/a electrolytic lead. CINF is the first to introduce Kivcet technology to an EPC-based project.
The security housing construction project in Wenzhou
CINF has undertaken the project on BT basis. It covers the two sections of the Dongyu village in Lucheng district government, security housing rebuilding in Zhuangtou and Putao village renovation. The
The mine project of CHINALCO Chongqing Alumina Co.
The project is located in Shuijiang town, Chongqing. The capacity is 1,650kt/a. The 8.5km-long No.575 main adit is now the longest double-track transporting adit in nonferrous industry.
The bauxite mine project (Phase I) for the Alumina Plant of CHINALCO Shanxi Huaxin Alumina Industry Co.
The project is located in Xingxian County, Shanxi Province. The capacity is 1,320kt/a qualified bauxite. The project construction started in Aug., 2011 and was put into production in Oct., 2013.
The EPC project of bauxite mine for Guangxi Huayin alumina refinery
The Phase I bauxite mine project is located in Jingxi, Guangxi Province with annual production of 3.9 million ton qualified bauxite The project construction started in June,
The relocation and upgrading project of the 4,000t/a Co (Phase I) production line of Ganzhou Huaan Cobalt Industry Co.
The project was put into production in 2009. It produces Co3O4, CoCO3, CO(OH)2, COSO47(H2O) and Co powder products, together with the by-products of nickel sulfate and cathode copper,
The high-arsenic polymetallic material recovery project of Chenzhou Fengyue Environmental Protection Science and Technology Co., Ltd
The project is located in Chenzhou City, Hunan Province. The process of enriched-oxygen side-blown oxidation smelting + enriched-oxygen side-blown reduction smelting (CSCC-Pb) is applied to process hi
Oxygen pressure leaching and sulfur recovery of the 100kt/a electrolytic zinc project of Western Mining Co.
The project is located in Xining, Qinghai Province. It consists of two key parts of oxygen pressure leaching and sulfur recovery. The construction was completed and equipment was commissioned in Augus
Geological Exploration
Mining and Mineral Processing
Metallurgy
New Energy and New Materials
EPC
Equipment Manufacture
Architecture
Energy and Power
Supervision
Tailings Storage Facility
Water Supply and Drainage
Supervision Works