The W smelter project of Jiangxi Ganbei W Industry Co., Ltd
The project was built to produce 5,000t APT (in later period it was planned to produce 10kt/a). The design was completed in 2004 and the project was put into production in 2005.
The 200kt/a Pb-Zn smelting and resource comprehensive utilization project of Jiangxi Copper Group Co.
The project applies the KIVCET Pb-smelting process and treats the leaching residue from Zn system. It was put into production in 2011 and runs stably.
The comprehensive utilization and upgrading project of the 500kt/a copper-bearing waste residue of Jiangxi Heyuan Industrial Co., Ltd
The technology of enriched-oxygen side-blown bath smelting is used to recover Cu, Ag and other valuable metals in residue.
Oxygen Bottom-blown Oxidation and Liquid High-Pb Slag Direct Reduction for Pb Smelting
Oxygen bottom-blown smelting technology is adopted for environmental control project of 80kt/a bath smelting direct Pb smelting of Henan Yuguang Gold and Lead Co., Ltd,
The 30kt/a electrolytic manganese metal project of Guizhou Tongren Jinfeng Mn Industry Co.
The main designed indexes, as well as the comprehensive utilization level, mechanization level automation control level of the project have all achieved the first level in the Mn industry in China.
The technical upgrading project of the cemented carbide bar production line of Nanchang Cemented Carbide Co., Ltd.
The project is located in Nanchang, Jiangxi Province. The capacity is 400t/a cemented carbide bars and strips. The key technology and equipment is imported to produce the ultra-fine grain cemented car
The In-Zn system of Laibin Huaxi Smelting Co.
The project is to produce 60kt/a Zn ingot, 80t/a In ingo. The In system was put into production in 1997, while the Zn system was in 1999. In order to process the high In-Zn concentrates and improve th
The 150kt/a nonferrous metal waste comprehensive recycling project of Hunan Yishui Nonferrous Metals Co.,Ltd
The project is aimed to process the “three wastes”. The throughput is 150kt/a smelted slag .The production capacity is 50kt/a Pb ingots and Zn ingots,
Geological Exploration
Mining and Mineral Processing
Metallurgy
New Energy and New Materials
EPC
Equipment Manufacture
Architecture
Energy and Power
Supervision
Tailings Storage Facility
Water Supply and Drainage
Supervision Works