The relocation, technical upgrading and expansion project for valuable metals recovery of Yinhai Nonferrous Metals Comprehensive Recycling Co.
The project adopts the technology of oxygen-enriched side-blown smelting to process lead and zinc residue materials and the hot-air oxygen-enriched blast furnace to process Cu-bearing residue.
The technical upgrading project for Ga and Ge recovery operation of 100kt/a electrolytic Zn oxygen pressure leaching plant in Danxia Smelter
The capacity of the project is 100t/a electrolytic Zn. It was put into production in 2009 and is the first large Zn smelter to apply the sulfide concentrate direct oxygen pressure leaching process.
The 60kt/a electrolytic zinc smelting project of Western Mining Co.
The project applies the conventional hydrometallurgical process for zinc smelting. The main process covers the zinc concentrate roasting, leaching, purification,
The PCB bars and compound production line of the technical upgrading (Phase Ⅱ) of the 1,500t sectional material plant of Zhuzhou Cemented Carbide Group Co.
The project is located in Zhuzhou, Hunan Province. The capacity is 500t/a superfine cemented carbide PCB bar materials and 1,200t/a superfine cemented carbide compound.
The comprehensive iron recovery from red mud
The project is located in Pingguo, Guangxi Province, owned by Guangxi Branch of CHINALCO. It was put into production in 2011 with annual red mud tailings throughput of 2.2Mt.
The Kaldo furnace Pb smelting project of Western Mining Co.
The capacity of the project is 50kt/a lead bullion. It is the first Pb smelter with Kaldo furnace in China.
The 100kt/a electrolytic zinc smelting project of Sichuan Huili Huixin Pb-Zn Smelting Co., Ltd
The project applies zinc concentrate direct pressure leaching process to turn the sulfur in the concentrate into elemental sulfur and produce sulphur products.
The Li, K and B resources development and utilization project of Qinghai East Taijinaier Salt Lake
The project was successful put into commissioning and production at one go in 2012. It produced 18kt/a lithium carbonate from the bittern by the process of “purification—concentration—refining—precipi
Geological Exploration
Mining and Mineral Processing
Metallurgy
New Energy and New Materials
EPC
Equipment Manufacture
Architecture
Energy and Power
Supervision
Tailings Storage Facility
Water Supply and Drainage
Supervision Works