European Manganese Electrolytic Manganese Metal Project
Project construction location: European Manganese Industry, Hvaletice Town, Pardubice Oblast, Czech Republic; Construction scale: annual output of 47,500 tons of high-purity selenium-free electrolytic manganese metal; Project features: The manganese content of raw materials is only 7.08%, and the soluble manganese rate is low. Process flow: The classic process flow of pulping, leaching and iron removal, purification, electrolysis, washing, drying, product stripping and packaging is adopted.
Jiaman New Energy Co., Ltd. High Matte Nickel Project
The Jiaman project is located in Maluku Province, Indonesia. The construction scale is to produce 40,000 tons of high nickel matte per year. It uses oxygen-enriched side-blowing smelting to process laterite nickel ore, and produces low nickel matte through reduction and sulfidation. Low nickel matte is treated by multi-gun top blowing furnace, and high nickel matte products containing 70% nickel are produced. This project is the world's first multi-gun top-blowing furnace to blow low nickel matte into high nickel matte, and will be put into production in April 2025.
Overall Development Planning Study and Design for TFM Copper-Cobalt Mine in the Democratic Republic of the Congo
The TFM copper-cobalt mine is located in Fungurume Town, Kolwezi City, Lualaba Province, DRC. The mine is in production with copper output of 450,000t/a and cobalt output of 38,000t/a. It is currently one of the top 10 copper mines in the world and the second largest cobalt mine in the world. In view of the resource advantages of CMOC Group Limited's TFM copper-cobalt mine in the DRC, CINF is currently conducting the overall development planning study and design for the mine, optimizing the existing open-pit mining, processing and metallurgical system, adding underground mining and supporting processing and metallurgical facilities. Within 3 to 5 years after the implementation of the planning project, the TFM copper-cobalt mine can achieve the target of cathode copper output of 650,000 to 800,000 tons/year, achieve a total industrial output value of over 10 billion US dollars/year, and create more than 3,000 related jobs. The economic and social benefits are significant.
Mining Engineering of 6000kt/a Mining and Processing Upgrading and Expansion Project of Tajik-China Mining Co., Ltd.
The project is located in Khujand, Sughd Province, Tajikistan. The design adheres to the concept of sustainable, stable and high-quality development, integrates new productivity to eliminate safety risks in the existing production system and solve critical problems. By pioneering a scaled, intensive mining model featuring centralized transportation and series development in multiple mining areas, the project has created strong profitability for the enterprise. The project is a benchmark for China-invested enterprises to successfully invest in countries along the "Belt and Road" under the "Belt and Road" initiative, and a model of mutual benefit and win-win in China-Tajikistan cooperation.
Lithium Extraction Project with Output of 50,000t/a (LCE) Lithium Chloride from Salt Lake in Argentina
The project is located in Salta Province, Argentine, the "lithium triangle" of South America. The mining depth of the aquifer in the brine extraction area reaches 300m. 72 brine extraction wells are used, and the annual brine extraction and transportation capacity reaches 23,000,000m3. The project was completed and put into operation in 2023.
Senmonorom Bauxite Mine in Cambodia
Senmonorom Bauxite Mine is located in Mondulkiri, Cambodia, with open-pit mining, the ROM ore mining capacity of 22000kt/a and washed ore capacity of 10000kt/a. By using large-scale mechanized non-blasting continuous and efficient intelligent mining technology, combined with three-stage ore washing process including two-stage large trommel screen + one-stage linear screen, and modular design of plant buildings, electrical and water supply & drainage, the construction period for overseas project has been significantly shortened.
Cao Bang Nickel-Copper Mine in Vietnam
Cao Bang Nickel-Copper Mine is located in Cao Bang Province, Vietnam, with open-pit mining, and a design capacity of 3000t/d. The ore body has a wide distribution range and low grade, which belongs to refractory copper-nickel sulfide ore rich in magnesium silicate minerals. By utilizing advanced mining software for multi-approach and multi-scenario technical analysis and comparison, a new efficient flotation process for copper-nickel sulfide ore was developed, striving to the fullest to maximize the project benefits.
The First Underground Mine in Eritrea—Koka Gold Mine
Koka Gold Mine is located in Eritrea, east Africa, under a seasonal river. The problems such as complex engineering geological and hydrogeological conditions, and poor external construction conditions have been overcome, realizing open-pit mining to underground mining, with a design capacity of 660kt/a. The project has played a key leading role in promoting the development of mining industry in Eritrea.
Geological Exploration
Mining and Mineral Processing
Metallurgy
New Energy and New Materials
EPC
Equipment Manufacture
Architecture
Energy and Power
Supervision
Tailings Storage Facility
Water Supply and Drainage
Supervision Works